Thor checks a coin before you buy and shows the result in the Safety row of the coin sheet. Tap the row to read every check, worst first, each with what it means. A serious finding turns the row red.

What the result tells you (EVM chains)

ResultMeaning
Security checks passedNo warning signs found
High risk · (number) flagsCheck the flags before buying
Scam risk · trade blockedThor won't buy this coin
CautionThe checks disagree. Press Buy again to continue anyway

Flags you may see include Honeypot, Can't sell all, Mintable supply, Blacklist, Hidden owner and Transfers can be paused. If there is no sell pool right now, Thor says so: a sell only works on the liquidity your own buy adds.

Solana coins show their warnings in the Safety row and in Trenches flags, but get no block verdict.

Token tax (every chain)

Some tokens take a cut on each buy or sell. Thor shows it on every quote: Buy tax (%) · Sell tax (%), plus the dollar amount of this trade.

  • Above 0 is amber. 5% or more on either side is red.
  • not checked means that side wasn't checked.

Warning: If the tax is at or above your slippage, the trade will most likely fail and still cost a network fee. Set the slippage above the tax, or skip the coin.

Good to know

  • The tax is information only: no trade is blocked because of its tax.
  • A passed check is not a promise. See Trading safely.